Built To Hold.
Checked Before It’s Covered.

Residential and commercial construction across Harare — from a cleared stand to a finished handover. We get involved before mistakes get expensive.

Views on our site videos
565K+Views on our site videos
Following our builds
9.3K+Following our builds
And surrounding areas
HarareAnd surrounding areas
  • Harare-basedLocal teams, local suppliers
  • Residential & commercialHomes, shops and warehousing
  • Structure firstStrength built in, not added on
  • Stage-by-stage checksCaught early, not at handover

Watch the work

We show the stages most builders never film

Every one of these was shot on a Blerang site. They have been watched 565K+ times — mostly by people who wanted to know what their own builder was doing under the slab.

Total views
565K+
Followers
9.3K+

Videos play from Facebook. See all of them on our page →

Why Blerang

Most people focus on the roof

Everyone wants to see the finished house. But the parts nobody photographs — the foundation depth, the steel in the ring beam, whether the slab was cast level — are what decide if it is still sound in ten years.

That is where we spend our attention, and it is why we get involved before mistakes get expensive.

We catch it before it is covered

A crooked wall, a thin slab, a compromised ring beam — none of it shows once the plaster is on. We inspect each stage before the next one hides it.

Quotes that hold

Underquoting is how builds stall halfway. We price the whole job honestly up front, itemised, so you know what you are committing to.

You can see the work

Photographic progress reports each stage — the same way we document builds publicly. Useful whether you are across town or overseas.

We will tell you no

Sometimes the most expensive decision is keeping a building that should come down. We give you the honest assessment before you spend.

How a build runs

Six stages, each signed off before the next

  1. 01

    Site clearing

    Setting out and preparing the ground.

  2. 02

    Foundations

    Excavation, footings and reinforcement.

  3. 03

    Slab

    Cast to line and level before walls go up.

  4. 04

    Brickwork

    Walls plumbed and checked as they rise.

  5. 05

    Ring beam

    The stage that locks the structure together.

  6. 06

    Roof & finishes

    Trusses, sheeting, plaster and handover.

Strength is built into the structure — not added in the finishes.

Blerang Contractors, on site in Harare

Our work

Recent projects

A sample of the residential, commercial and structural work we have delivered around Harare.

View All Projects
Site photo coming soon
Residential2025

Four-Bedroom Family Home

Harare

New-build family home taken from a cleared stand through foundations, slab, brickwork and roof to a finished handover.

Site photo coming soon
Structural2025

Foundation & Slab Package

Harare

Excavation, footings, reinforcement and a cast floor slab set out to line and level before any walls went up.

Site photo coming soon
Commercial2025

Retail Shopfront Build

Harare

Ground-floor retail unit built and fitted out to a trading deadline, including shopfront, screed and services.

Free — no email required

12 checks before your slab is poured

Foundation depth, bar spacing, cover blocks, damp proofing, mix strength. Once the concrete is down, none of it can be inspected again. Print it and take it to site — even if someone else is building.

Building from abroad

You cannot inspect the site. So we send you the site.

We build for Zimbabweans living overseas regularly. Stage-by-stage photographic reports, verified quantities and one point of contact — so you know what went into your house instead of hoping.

How remote builds work
Supervisors checking drawings against the structure on site

Have a project in mind?

Tell us what you are building and where you are up to. We will come back with a clear, itemised quote — no obligation.